General Information

These sections contain downloadable documentation, resources and links to online systems to support you working with IFA Interconnector.

entsoe.net

Visit entsoe.net for the total sum of nominations, in addition to IFA auction information.

European Network Code proposals & Methodologies

Link to the National Grid UK site where you can view approved Network Code methodologies and proposals 

CACM 69 DayAhead Firmness Deadline Proposal

This is a regional proposal

CACM 69 DayAhead Explanatory Note

Explanatory Note  for the regional proposal

CACM 44 Channel Day Ahead Fallback

This is a regional proposal

NEMO Appointment [And Services] Agreement

As an output deriving from the approved GB TSOs’ day ahead proposal for arrangements concerning more than one Nominated Electricity Market Operator (NEMO) in the GB Bidding Zone in accordance with Article 45 of the Commission Regulation (EU) 2015/1222 establishing a guideline on Capacity Allocation and Congestion Management, the following document is published consisting of the standard form agreement (the “Proposed Terms”) as described therein. The respective GB-wide interconnector owners have been instrumental in drafting the standard form agreement and reserve the right to amend such in the future (at all times in compliance with the Capacity Allocation and Congestion Management Regulation and the approved GB TSOs’ day ahead proposal) and will do so in consultation with the respective NEMOs.

FCA 31 Amended Channel Region Design of Long Term Transmission Rights

This is a regional proposal

CACM 73 Congestion Income Distribution

ACER decision 14th Dec 2017

FCA 36 Channel Region PTR Nomination Rules

This is a regional proposal

Approved by Ofgem 9th April 2018